Construction of an elevator for an existing block: how does it look in practice?

Many four-story blocks from the 1970s and 80s were built without elevators because the regulations at the time did not require them. Today, residents are getting older, and stairs become a real barrier. Communities and cooperatives are increasingly asking whether it is possible to bring a lift to a ready-built building, how long it takes, and who will pay for it. The answer is: it is possible, although it is an investment for several months that requires the approval of the residents, a project, and patience.

Where to start before anyone puts the first nail down

The first step is not choosing a company, but a resolution. In a cooperative, the decision is made by the board after consulting with the residents; in a community, a resolution from the owners is needed, because the elevator extension exceeds ordinary management. It is worth having a preliminary estimate and several options at this stage, because people are more likely to vote if they see concrete numbers rather than a slogan about improving comfort.

Simultaneously, it is necessary to determine, which crane is actually involved. In rooms without free space, the most common choice is an external elevator with no moving parts; sometimes there are stops on the upper floors. You can find an overview of elevator types and which facilities they are suitable for at this address. https://uxplus.pl/biznes-firma/jaki-rodzaj-windy-wybrac/, So here we focus on the process itself. After selecting the solution, the architect checks whether the building’s design and plot of land allow for a quick construction, and then submits an application for a building permit.

How long does it take and what can go wrong?

The actual timeline for one site is usually 10 to 16 months from the decision to the first drive. The most time is taken up by paperwork: the building permit, arrangements with the network operators, and sometimes the opinion of the conservator. The actual construction work on the outer glass takes about 3 to 5 months, while the installation of the crane takes another 4 to 6 weeks., and finally, a user acceptance test by UDT, without which the elevator cannot carry people.

Delays usually originate from three places. The first is the connections, because the plumber likes to be exactly where the cable or pipe runs. The second are the balconies and windows, which lose some of their light after the addition, which causes objections from the neighbors. The third is the availability of the team, because good contractors have calendars filled with work for many months ahead.

Stage of crane assembly before the UDT inspection

Costs and funding

The construction of a lift shaft for a four-story block is an expense of the order of several hundred thousand zlotys for one cage, Depending on the design, the number of stops, and the finish. This is in addition to the costs of the project, supervision, and subsequent operation: maintenance every 30 days, annual UDT inspection, and electricity. Therefore, at the planning stage, it is worth comparing offers not only with the purchase price but also with the cost of an annual service.

Part of the expenses can be transferred to support programs. Cooperatives and communities can apply for funds from the program. The availability of Plus, where the money goes towards the construction of the lift, the purchase and installation of the crane, and the adaptation of the entrance to the building. Some municipalities have their own subsidies for the removal of architectural barriers, so it is worth asking at the office before the community collects the entire amount from the renovation fund.

Is the elevator extension worth it?

From the perspective of the owner of the apartment on the fourth floor, the elevator is not only convenient, but also the value of the property. Apartments in blocks without a lift sell more slowly and cheaper, and after installation the price difference between the ground floor and the top floor noticeably decreases. For older residents, this means the possibility of staying in their apartment instead of moving to the ground floor or to a care facility.

On the downside, there are the monthly cost of servicing and energy, which goes into the operating fees, and several months of noise and inconvenience at the entrance. In most blocks with four floors, the balance sheet still turns out positive, especially since there will be fewer blocks without a lift and they will start to fall behind the market.